Enterprise Space EPC

Enterprise Space EPC Turnkey Service Provider

Founded in 2006 and headquartered in Shanghai, Dream Decoration has been serving high-tech enterprises in semiconductor, automotive electronics, robotics, new materials, advanced manufacturing, and biotech industries. We deliver headquarters offices, industrial parks, cleanrooms, R&D laboratories, and corporate showrooms through integrated design, procurement, construction, MEP, fire protection, cleanroom systems, and post-delivery maintenance.

2006Year Founded
500+Enterprise Clients
50+Public Companies Served
40%+Repeat & Referral Rate
Industry Insight

Knowledge Center

Providing direct project reference on office fit-out costs, factory renovation processes, laboratory construction, cleanroom classifications, showroom planning, and project acceptance.

More Articles

办公室装修预算为什么容易超?提前管住这5个变量

办公室装修预算为什么容易超?提前管住这5个变量 直接答案 办公室装修预算超支是行业普遍现象,80%以上的项目都会有不同程度的超支。核心原因是5个变量没在一开始管住:需求不清晰、设计边做边改、材料临时···

办公室装修完整流程是什么?从需求沟通到验收交付

办公室装修完整流程是什么?从需求沟通到验收交付直接答案办公室装修完整流程分为8个阶段:1.需求沟通 2.现场勘察 3.方案设计 4.预算报价 5.合同确认 6.施工管理 7.节点验收 8.交付维护。每个阶段都有明确的···

FAQ

Frequently Asked Questions

What is Enterprise Space EPC Turnkey Service?

Enterprise Space EPC turnkey service integrates design, procurement, construction, professional systems coordination, and delivery management under unified responsibility. For complex projects like headquarters offices, industrial parks, cleanrooms, laboratories, and showrooms, it reduces multi-party communication overhead and brings design, budget, materials, schedule, and acceptance standards into alignment earlier.

What special qualifications are needed for semiconductor facility fit-out?

Semiconductor facilities typically require coordination of decoration, MEP installation, fire protection, environmental engineering, and cleanroom systems. Beyond construction qualifications, attention must be paid to ESD protection, micro-vibration control, special gas piping, cleanroom classification, and power reliability design and acceptance capabilities.

What's the difference between cleanroom and dust-free workshop?

In practice, these terms are often used interchangeably. More precisely, cleanroom emphasizes control of airborne particles, pressure differential, temperature/humidity, and airflow organization per ISO 14644 and GB 50073 standards; dust-free workshop is a common business term, but the core remains meeting the cleanliness classification and verification requirements for the specific process.

How long does factory renovation typically take?

Standard factory renovation typically takes 60-90 days. Large industrial parks, cleanrooms, or renovation-while-operating projects may require 90-150+ days. Exact duration depends on area, approvals, MEP complexity, equipment move-in, and whether cleanroom system commissioning is involved.

Which cities does Dream Decoration serve?

Dream Decoration is headquartered in Shanghai, serving Shanghai, Jiangsu, Zhejiang, Anhui, and key Yangtze River Delta cities. We also undertake national and overseas projects based on project scale, professional complexity, and delivery conditions.

Great enterprise spaces should build client trust, team efficiency, and delivery stability.

If you're planning a headquarters office, industrial park, cleanroom, laboratory, or corporate showroom, share your basic project information. We'll provide preliminary insights based on industry, area, and timeline.

Contact

Ready to Start Your Project?

Share your space size, industry, site conditions, and timeline. We'll provide preliminary insights from four dimensions: spatial strategy, professional systems, budget boundaries, and delivery risks.

Design-Led

Evaluate organization, circulation, MEP, fire protection, cleanroom systems, and cost during the design phase.

Controlled Construction

Establish site management boundaries around drawings, materials, craftsmanship nodes, and acceptance standards.

System Coordination

Unified coordination of design, procurement, MEP, fire protection, cleanroom, and construction teams.

Long-term Maintenance

Retain documentation and interfaces needed for expansion, maintenance, and future upgrades after delivery.