Enterprise Space EPC

Enterprise Space EPC Turnkey Service Provider

Founded in 2006 and headquartered in Shanghai, Dream Decoration has been serving high-tech enterprises in semiconductor, automotive electronics, robotics, new materials, advanced manufacturing, and biotech industries. We deliver headquarters offices, industrial parks, cleanrooms, R&D laboratories, and corporate showrooms through integrated design, procurement, construction, MEP, fire protection, cleanroom systems, and post-delivery maintenance.

2006Year Founded
500+Enterprise Clients
50+Public Companies Served
40%+Repeat & Referral Rate
Industry Insight

Knowledge Center

Providing direct project reference on office fit-out costs, factory renovation processes, laboratory construction, cleanroom classifications, showroom planning, and project acceptance.

More Articles

节省20万:办公室装修品质与性价比案例解析

案例背景:天硕导航面临的装修挑战 天硕导航是无人机导航系统供应商,大疆创新核心供应链企业,此次需要打造面积1700㎡ 的总部办公空间。在项目启动前,天硕导航对比过多家公装公司,面临的核心痛点是:多数···

FAQ

Frequently Asked Questions

What is Enterprise Space EPC Turnkey Service?

Enterprise Space EPC turnkey service integrates design, procurement, construction, professional systems coordination, and delivery management under unified responsibility. For complex projects like headquarters offices, industrial parks, cleanrooms, laboratories, and showrooms, it reduces multi-party communication overhead and brings design, budget, materials, schedule, and acceptance standards into alignment earlier.

What special qualifications are needed for semiconductor facility fit-out?

Semiconductor facilities typically require coordination of decoration, MEP installation, fire protection, environmental engineering, and cleanroom systems. Beyond construction qualifications, attention must be paid to ESD protection, micro-vibration control, special gas piping, cleanroom classification, and power reliability design and acceptance capabilities.

What's the difference between cleanroom and dust-free workshop?

In practice, these terms are often used interchangeably. More precisely, cleanroom emphasizes control of airborne particles, pressure differential, temperature/humidity, and airflow organization per ISO 14644 and GB 50073 standards; dust-free workshop is a common business term, but the core remains meeting the cleanliness classification and verification requirements for the specific process.

How long does factory renovation typically take?

Standard factory renovation typically takes 60-90 days. Large industrial parks, cleanrooms, or renovation-while-operating projects may require 90-150+ days. Exact duration depends on area, approvals, MEP complexity, equipment move-in, and whether cleanroom system commissioning is involved.

Which cities does Dream Decoration serve?

Dream Decoration is headquartered in Shanghai, serving Shanghai, Jiangsu, Zhejiang, Anhui, and key Yangtze River Delta cities. We also undertake national and overseas projects based on project scale, professional complexity, and delivery conditions.

Great enterprise spaces should build client trust, team efficiency, and delivery stability.

If you're planning a headquarters office, industrial park, cleanroom, laboratory, or corporate showroom, share your basic project information. We'll provide preliminary insights based on industry, area, and timeline.

Contact

Ready to Start Your Project?

Share your space size, industry, site conditions, and timeline. We'll provide preliminary insights from four dimensions: spatial strategy, professional systems, budget boundaries, and delivery risks.

Design-Led

Evaluate organization, circulation, MEP, fire protection, cleanroom systems, and cost during the design phase.

Controlled Construction

Establish site management boundaries around drawings, materials, craftsmanship nodes, and acceptance standards.

System Coordination

Unified coordination of design, procurement, MEP, fire protection, cleanroom, and construction teams.

Long-term Maintenance

Retain documentation and interfaces needed for expansion, maintenance, and future upgrades after delivery.